Phase 2: The Future Is Now - A Passion for His Glory
Student Ministries Building
Phase 2 of the Hampstead Campus is a 22,000 square foot building for youth and college ministries.
The Youth Ministry Area
The south side of the building is dedicated to students in grades 7-12. It features a large worship assembly area, an activity area with wireless internet access, video games, pool table, foosball, ping pong, air hockey, and a café.
The College Ministry Area
The north side of the building will house the Kaleo College Ministry. It features a large worship area, lounge, and refreshment bar. Wireless internet access is also available.
The building also features a full kitchen on the first floor in between the two large assembly areas, office space for youth and college ministry staff, and reception areas for both ministries. The second floor is accessed from stairwells on the front (east) and the north sides of the building and is the location for educational classrooms.
The Student Ministries Building opened on Sunday, February 3, 2008.